Vango Exodus V 800 Bruksanvisning

Vango Full Exodus V 800

Les nedenfor 📖 manual på norsk for Vango Exodus V 800 (6 sider) i kategorien Full. Denne guiden var nyttig for 2 personer og ble vurdert med 4.7 stjerner i gjennomsnitt av 1.5 brukere

Side 1/6
TENT PITCHING INSTRUCTIONS EXODUS 600/800 (UK)
FLYSHEET FIRST PITCHING:
Open out inner and position in required direction.
Peg out the four main corners of the tent using the pegs supplied
Locate inflating points at the base of each beam
Access the beams through the zipped entry points and through the
side door
For the first use of the AirBeam, fully unscrew all the valves from the
AirBeams and screw back in carefully before inflating - this ensures
that the valve is not cross-threaded.
Remove smaller screw-cap on valve and insert pump nozzle, of the
Vango AirBeam™ pump supplied
Inflate all tubes to 7psi. The tubes MUST be guided into an arch as
they are inflated.
Final tube pressure MUST NOT exceed 8psi
DO NOT OVER-INFLATE THE BEAMS
Start with the centre tube and guide the beam into an upright
position while it is inflating
Inflate the other beams.
Remove pump & tighten screw-cap. Ensure both parts of valve are well fitted so it is air tight but do not over tighten.
Ensure the tent is in a straight line
The groundsheet should be flat and wrinkle free
Peg out the remaining poles and pegging points using pin pegs at the base of poles
Peg out ALL guy lines using pin-pegs ensuring that guy line fabric attachment points are evenly tensioned.
Reposition and adjust tensioning where necessary
SIDE DOOR COVER:
Once the tent is pitched, remove the ends of the side door cover AirBeam from the hook & loop on the tent
Place the pump on the ground and stretch the hose up to the valve
Inflate the beam to 7psi
Reattach the AirBeam ends to the corresponding hook & loop on the tent
CORRECT PUMP SET-UP:
Pump Body > Pressure Valve > Pressure Gauge > Hose
(Ensure the valve/gauge/hose are connected to the inflation port of the pump)
INNER ATTACHMENT:
Open out inner tent inside flysheet and position doorways to correspond with the living area
Starting from the rear corners of the tent, attach the elasticated hooks on the groundsheet to corresponding rings on the flysheet
Suspend the inner by attaching toggles of inner tent through rings on inside of flysheet
Do the rear first and work forward
TENSION BAND SYSTEM:
Remove Tension Band System from pockets and attach into the corresponding clips at the apex of the pole
Adjust the straps until they are taut
DO NOT OVERTENSION. Excess tension will alter the shape of the tent
TO DEFLATE THE AIRBEAM TENT:
Unscrew the valve fully from the beam, taking care as the valve will be under pressure from the air inside the tube.
IN THE UNLIKELY EVENT OF A PUNCTURE:
Note - most apparent punctures are the result of the valve not being screwed in correctly. Please check the valves before changing the AirBeam in
question
Deflate the air beam. Unzip the internal flysheet sleeve which contains the affected beam.
Remove the tube and its protective outer.
The zips for the protective outer are cable tied together to prevent accidental access. Cut the cable tie and open the zip.
DO NOT open these zips when the tube inflated.
Remove the clear rubberised tube from the protective sleeve taking care when removing the valve from the sleeve.
Partially inflate the tube and pass through a bucket or basin of water, looking for air bubbles. This will indicate location of puncture
Use the repair patch provided and cover hole, using instructions on patch. Re-insert tube into protective outer, closing zip from both ends, so that zip
pullers are in the flysheet sleeve (this might be easier with the tube partially inflated)
………………………………………………………………………………………………………………………………………………………………………………………….....

Produkspesifikasjoner

Merke: Vango
Kategori: Full
Modell: Exodus V 800

Trenger du hjelp?

Hvis du trenger hjelp med Vango Exodus V 800 still et spørsmål nedenfor, og andre brukere vil svare deg