Wolf CGB-2-75 Bruksanvisning
Wolf
sentralvarmekoker
CGB-2-75
Les nedenfor 📖 manual på norsk for Wolf CGB-2-75 (64 sider) i kategorien sentralvarmekoker. Denne guiden var nyttig for 3 personer og ble vurdert med 4.5 stjerner i gjennomsnitt av 2 brukere
Side 1/64

WOLF GMBH / POSTFACH 1380 / D-84048 MAINBURG / TEL. +49.0.87 51 74- 0 / FAX +49.0.87 51 74- 16 00 / www.WOLF.eu
Doc. no.: 3062555_201804 Subjecttomodications
GB
Installationandoperatinginstructions
Wall mounted gas condensing boiler
CGB wall mounted gas condensing boiler
CGB-75
CGB-100

2 3062555_201804
Tableofcontents
1. Documentation information ................................................................3
2. Safety information ..............................................................................4
3. Standards and regulations .................................................................7
4. Control / Function / Operation ........................................................10
5. Delivered condition / standard delivery ............................................12
6. Layout ..............................................................................................13
7. Siting instructions ............................................................................14
8. Installation .......................................................................................15
9. Dimensions/installation dimensions .................................................16
Installation
10. Installation .......................................................................................17
11. Installation of the air/flue gas routing ...............................................21
Control
12. Electrical connection ........................................................................22
Commissioning
13. Filling the system .............................................................................28
14. Conversion to natural gas E/LL (G20/G25) (if necessary) ...............29
15. Conversion to LPG P (G31) (if necessary) ......................................30
16. Conversion to other gas types (if required) .....................................31
17. Checking the gas supply pressure ..................................................32
18. Commissioning / setting the BUS address ......................................33
19. Displaying / modifying control parameters .......................................34
20. Adjusting the modulating pump (accessory) ....................................35
21. Limiting the maximum output ...........................................................36
22. Testing the combustion parameters ................................................. 37
23. CO
2
adjustments .............................................................................38
24. Commissioning report ......................................................................40
Specication
25. Maintenance and design data .........................................................41
26. Technical information for water treatment ........................................ 43
27. System log .......................................................................................45
28. Technical information .......................................................................46
29. Wiring diagram ................................................................................56
30. Specification ....................................................................................57
31. Troubleshooting ............................................................................... 58
32. Product datasheet to EU regulation No. 811/2013 ..........................60
33. Technical parameters to EU Regulation No. 813/2013 ....................61
34. Notes ...............................................................................................62
EU declaration of conformity ...................................................................63

33062555_201804
1. Documentationinformation
1.1 Otherapplicabledocuments
- Technical information
- Maintenance instructions
- System and operator’s log
The instructions for all accessory modules and other accessories also apply where
relevant.
1.2 Safekeepingofthesedocuments
The system user or operator should ensure the safekeeping of all instruction manuals
and documents.
► Handovertheseinstallationinstructionsaswellasallotherapplicablemanuals
to the system user or operator.
1.3 Instructingthesystemuser
- Instruct the system user to take out an inspection and maintenance contract with
an approved contractor.
- Inform the system use that the annual inspection and maintenance may only be
performed by an approved contractor.
- Inform the system use that repair work may only be performed by an approved
contractor.
- Inform the system user that only original spare parts may be used.
- Inform the system user that no technical changes may be made to the boiler or
control unit.
- Inform the system user that they are responsible for the safety, environmental com-
patibility and energy quality of the heating system (German Immission Control Act/
Energy Saving Ordinance) [Germany].
- Inform the system user that these instructions and the other applicable documents
must be kept in a safe place.
- Instruct the system user how to operate the heating system.
1.4 Applicabilityoftheseinstructions
These installation instructions apply to CGB-75/100 gas condensing boilers.
1.5 Acceptance
Within four weeks of commissioning of the burner the operator must notify the local
flue gas inspector accordingly. According to the Bundes-KÜO (German Federal
Sweeping and Inspection Act), tests and inspections are only required every 3 years
[Germany].
1.6 Recyclinganddisposal
- Old equipment may only be disconnected from the gas and electricity supply by a
qualiedcontractor.
- Always dispose of materials according to environmental, recycling and waste man-
agement standards.
- Old appliances, wearing parts, defective components and environmentally hazard-
ous liquids and oils must be disposed of or recycled according to applicable waste
disposal regulations without harming the environment.
Theymustnotbedisposedofashouseholdwaste.
- Disposeofpackagingmadeofcardboard,recyclableplasticsandsyntheticller
materials in an environmentally compatible manner through appropriate recycling
systems or a recycling centre.
- Please observe the applicable national and local regulations.
Produkspesifikasjoner
Merke: | Wolf |
Kategori: | sentralvarmekoker |
Modell: | CGB-2-75 |
Trenger du hjelp?
Hvis du trenger hjelp med Wolf CGB-2-75 still et spørsmål nedenfor, og andre brukere vil svare deg
sentralvarmekoker Wolf Manualer
26 August 2025
sentralvarmekoker Manualer
Nyeste sentralvarmekoker Manualer
25 August 2025
4 August 2025
4 August 2025
4 August 2025