Apc RBC18 Bruksanvisning
Les nedenfor 📖 manual på norsk for Apc RBC18 (2 sider) i kategorien Accu. Denne guiden var nyttig for 36 personer og ble vurdert med 4.6 stjerner i gjennomsnitt av 18.5 brukere
                        Side 1/2
                    
                    
                    
990-0374A    revision 2   11/01
This a dendum does not apply to Ba k-UPS P o 1000/1400 and Smart-UPS V/S 1000/1400d c r  
I.Installation
Follow the installation illustration on the accompanying sheet.
Note: Small sparks at the battery connectors are normal during connection.
II. Post-Installation
Once installed, 
allow the unit to charge for five hours. If the unit is an XL model, allow it to charge for
24 hours.
Note: The Smart-UPS will charge whether it is on or off, and will charge whether there is a load
present or not. In situations where the power quality is poor, it is recommended that the unit be
shutdown during this charging period. A Smart-UPS that is powered on may switch to battery
operation which would prolong the time needed to fully recharge the battery.
III.  Clearing the Replace Battery LED
A. In order for the replace battery LED  validto be cleared, it is necessary to run a   self test. For a self test
to be considered valid, the following conditions must be satisfied:
■battery capacity must be greater than 75%(minimum of four battery bar graph LEDs illuminated)
or
■Smart-UPS must have been charging for at least 8 hours from the last low battery condition. (Low
battery condition refers to a state when the Smart-UPS battery has fully discharged).
B. Ways to initiate a self test
A self test can be initiated in any one of five ways:
■Start up of the UPS
■Smart-UPS front panel test button
■Powerchute PLUS software
■SmartSlot Accessory
■Automatic timer- every two weeks from turn on    (see APC owners manuals for details)
IV.   Verifying Operation
A. What happens during a self test?
When a self test is initiated, the unit supports the load while operating on battery for approximately
8-10 seconds. During this period, the Smart-UPS determines the health of the battery.
B. When should the self test be performed?
After the unit has charged for five hours, a self test can be performed.
Replacement Battery Cartridge(RBC) Addendum
RBC5, RBC6, RBC7, RBC8, RBC9, RBC11, RBC12, RBC22, RBC23, RBC24, RBC25,
RBC27, RBC28, RBC5I, RBC6I, RBC7I, RBC8I, RBC9I, RBC11I, RBC12I, RBC22I,
RBC23I, RBC24I, RBC25I, RBC5J, RBC6J, RBC7J, RBC8J, RBC11J, RBC12J,
Produkspesifikasjoner
| Merke: | Apc | 
| Kategori: | Accu | 
| Modell: | RBC18 | 
Trenger du hjelp?
Hvis du trenger hjelp med Apc RBC18 still et spørsmål nedenfor, og andre brukere vil svare deg
Accu Apc Manualer
                        
                         14 Desember 2024
                        
                    
                                                            
                        
                         14 Desember 2024
                        
                    
                                                            
                        
                         14 Desember 2024
                        
                    
                                                            
                        
                         14 Desember 2024
                        
                    
                                                            Accu Manualer
- Toa
- Ranex
- Sony
- Anova
- Renata
- Valcom
- CyberPower
- Ryobi
- Venom
- Powerplus
- APSystems
- Tripp Lite
- Cramer
- Impact
- Aim TTi
Nyeste Accu Manualer
                        
                         3 April 2025
                        
                    
                                                            
                        
                         21 Februar 2025
                        
                    
                                                            
                        
                         21 Februar 2025
                        
                    
                                                            
                        
                         31 Januar 2025
                        
                    
                                                            
                        
                         30 Januar 2025
                        
                    
                                                            
                        
                         23 Januar 2025
                        
                    
                                                            
                        
                         23 Januar 2025
                        
                    
                                                            
                        
                         23 Januar 2025
                        
                    
                                                            
                        
                         23 Januar 2025
                        
                    
                                                            
                        
                         23 Januar 2025