Kidde DY29 Bruksanvisning
Kidde
Røykvarsler
DY29
Les nedenfor 📖 manual på norsk for Kidde DY29 (11 sider) i kategorien Røykvarsler. Denne guiden var nyttig for 4 personer og ble vurdert med 4.5 stjerner i gjennomsnitt av 2 brukere
Side 1/11

Photoelectric Smoke Alarm
User Guide
0306-7276-00 Rev.A
For 9 Volt Battery Operated Smoke Alarm
Thank you for purchasing this smoke alarm. It is an important part of
your family’s home safety plan. You can trust this product to provide
the highest quality safety protection. We know you expect nothing less
when the lives of your family are at stake.
Please take a few minutes to read this User Guide and save it for future
reference. Teach children how to respond to the alarms, and that they
should never play with the unit.
ATTENTION: Please take a few minutes to thoroughly read this User guide
which should be saved for future reference and passed on to any subsequent
owner.
Model DY29
0333-CPR-292164
0333 - 18
EN14604:2005 + AC: 2008
0306-7276-00_DY29_UK_1F_V10:_ 2018.9.20 11:26 AM Page 1
�
KIDDE
™

D
o not try to repair the smoke alarm yourself. Refer to the instructions in
Section 9 for service.
WARNING! UNIT WILL NOT ATTACH TO MOUNTING PLATE UNLESS BATTERY IS
P
RESENT. REMOVAL OF BATTERY WILL RENDER THE SMOKE ALARM INOPERATIVE.
IMPORTANT! READ ALL INSTRUCTIONS BEFORE INSTALLATION AND KEEP THIS USER
GUIDE NEAR THE ALARM FOR FUTURE REFERENCE.
IMPORTANT: ADDITIONAL MARKINGS CAN BE FOUND ON BACK OF THE ALARM.
CONTENTS OF THIS USER GUIDE
1 -- RECOMMENDED LOCATIONS FOR SMOKE ALARMS
2 -- LOCATIONS TO AVOID
3 -- INSTALLATION INSTRUCTIONS
4 -- OPERATION AND TESTING
5 -- HUSH CONTROL FEATURE
6 -- MAINTENANCE
7 -- LIMITATIONS OF SMOKE ALARMS
8 -- GOOD SAFETY HABITS
9 -- WARRANTY/SERVICE
!!
0306-7276-00_DY29_UK_1F_V10:_ 2018.9.20 11:26 AM Page 2

1. RECOMMENDED LOCATIONS FOR ALARMS
•
Locate the first alarm in the immediate area of the sleeping rooms. Try to protect the
exit path as the sleeping rooms are usually farthest from the exit. If more than one
sleeping area exists, locate additional alarms in each sleeping area.
•
Locate additional alarms to protect any stairway as stairways act like chimneys for
smoke and heat.
• Locate at least one alarm on every floor level.
• Locate an alarm in every sleeping room.
• Locate an alarm in every room where electrical appliances are operated (i.e. portable
heaters or humidifiers).
• Locate an alarm in every room where someone sleeps with the door closed. The closed
door may prevent the alarm from waking the sleeper.
• Smoke, heat and combustion products rise to the ceiling and spread horizontally.
Mounting the smoke alarm on the ceiling in the centre of the room places it closest to
all points in the room. Ceiling mounting is preferred in ordinary residential construction.
• When mounting an alarm on the ceiling, locate it at a minimum of 10cm (4") from the
side wall (see Diagram "A").
• For wall mounting, use an interior wall and place the top edge of the alarm at least
10cm (4") and not more than 30.5cm (12") from the ceiling.
•
Install smoke alarms on sloped, peaked or cathedral ceilings at or within 0.9m
(3ft) of the highest point (measured horizontally). Smoke alarms in rooms with
ceiling slopes greater than 0.3m in 2.4m (1 foot in 8 feet) horizontally shall be
located on the high side of the room. A row of detectors shall be spaced and
located within 0.9m (3ft) of the peak of the ceiling measured horizontally.(see
DIAGRAM "C")
•
Put smoke alarms at both ends of a bedroom hallway or large room if the
hallway or room is more than 9.1m (30 feet) long.
•
Install Smoke Alarms on tray-shaped ceilings (coffered ceilings) on the highest
portion of the ceiling or on the sloped portion of the ceiling within 12”
(305mm) vertically down from the highest point (see DIAGRAM "D").
Mobile Home Installation
Modern mobile homes have been designed and built to be energy efficient. Install
smoke alarms as recommended above (refer to DIAGRAM A and C). In older mobile
homes that are not well insulated compared to present standards, extreme heat or
cold can be transferred from the outside to the inside through poorly insulated
walls and roof. This may create a thermal barrier which can prevent the smoke
from reaching an alarm mounted on the ceiling. In such units, install the smoke
alarm on an inside wall with the top edge of the alarm at a minimum of 10cm and
a maximum of 30.5cm below the ceiling (see DIAGRAM A).
If you are not sure about the insulation in your mobile home, or if you notice that
the outer walls and ceiling are either hot or cold, install the alarm on an inside wall.
For minimum protection, install at least one alarm close to the sleeping rooms. For
additional protection, see SINGLE FLOOR PLAN in DIAGRAM B.
WARNING: Test your smoke alarm operation after RV or mobile home has
been in storage, before each trip and at least once a week during use.
!!
0306-7276-00_DY29_UK_1F_V10:_ 2018.9.20 11:26 AM Page 3
Produkspesifikasjoner
Merke: | Kidde |
Kategori: | Røykvarsler |
Modell: | DY29 |
Trenger du hjelp?
Hvis du trenger hjelp med Kidde DY29 still et spørsmål nedenfor, og andre brukere vil svare deg
Røykvarsler Kidde Manualer
11 September 2025
11 September 2025
11 September 2025
8 September 2025
8 September 2025
8 September 2025
7 September 2025
6 September 2025
6 September 2025
6 September 2025
Røykvarsler Manualer
- Røykvarsler Kogan
- Røykvarsler Somfy
- Røykvarsler EMOS
- Røykvarsler Heatit
- Røykvarsler Nexa
- Røykvarsler Qolsys
- Røykvarsler Elgato
- Røykvarsler Nedis
- Røykvarsler Logilink
- Røykvarsler Drayton
- Røykvarsler SAVS
- Røykvarsler ESYLUX
- Røykvarsler Abus
- Røykvarsler AngelEye
- Røykvarsler Ferguson
- Røykvarsler First Alert
- Røykvarsler Alecto
- Røykvarsler Gloria
- Røykvarsler Smartwares
- Røykvarsler EQ-3
- Røykvarsler X-Sense
- Røykvarsler M-e
- Røykvarsler Pentatech
- Røykvarsler Cordes
- Røykvarsler Ei Electronics
- Røykvarsler FireAngel
- Røykvarsler DSC
- Røykvarsler Hochiki
- Røykvarsler REV
- Røykvarsler Devolo
Nyeste Røykvarsler Manualer
15 September 2025
15 September 2025
15 September 2025
15 September 2025
15 September 2025
15 September 2025
15 September 2025
15 September 2025
15 September 2025
15 September 2025