Wilbur Curtis WB5NLB Bruksanvisning
Wilbur Curtis
Ikke kategorisert
WB5NLB
Les nedenfor 📖 manual på norsk for Wilbur Curtis WB5NLB (10 sider) i kategorien Ikke kategorisert. Denne guiden var nyttig for 10 personer og ble vurdert med 3.9 stjerner i gjennomsnitt av 5.5 brukere
Side 1/10

1
Important Safeguards/Symbols
Models Included
• WB5N
• WB5NL
• WB5N30
• WB5NB
• WB5NLB
Service Manual – WB5N Hot Water Dispenser
Wilbur Curtis Company, inC.
Symbols:
WARNINGS – To help avoid personal injury
Important Notes/Cautions – from the factory
Sanitation Requirements
This equipment is designed for commercial use. Any servicing other than cleaning and routine
maintenance should be performed by an authorized Wilbur Curtis Company service technician.
• DO NOT immerse the unit in water or any other liquid
• To reduce the risk of re or electric shock, DO NOT open service panels. There are no user
serviceable parts inside.
• Keep hands and other items away from hot areas of the unit during operation.
• Never clean with scouring powders or harsh chemicals.
CAUTION: DO NOT
connect the unit to
hot water supply.
The inlet valve is not rated for
hot water.
CAUTION: Follow
this setup procedure
before attempting
to use this unit. Failure to
follow these instructions can
result in injury and/or void of
warranty.
ISO 9001:2008 REGISTERED
WILBUR CURTIS CO.
6913 Acco Street,
Montebello, CA 90640-5403
For the latest information go to
www.wilburcurtis.com
Tel: 800/421-6150
Fax: 323/837-2410
CAUTION:
Equipment must be
installed to comply
with applicable federal, state,
and local plumbing/electrical
codes.
INSTALLATION
This Curtis unit is pre-set and ready to go from the factory.
System Requirements:
• Water Supply 20 – 90 PSI (MINIMUM FLOW RATE of 2 GPM)*
• Electrical: See electrical schematic.
3. Connect the unit to electrical outlet with appropriate amperage rating (See serial tag on ma-
chine).
4. Once power has been supplied to the unit, ip the toggle switch to the ‘ON’ position (located on
the rear of the unit), the water tank will begin to ll. When the water level in the tank reaches the
probe, the heating element will turn on.
5. During the initial setup, the heating tank will reach operating temperature in 60 to 70 minutes
(factory default 204°F).
* Expect ow rate from hot water faucet to be 1 GPM from WB5N and 2 GPM from WB5NL
NSF requires the following water connection:
1. A quick disconnect or additional coiled tubing (at least 2x the depth of the unit) is required so
that the unit can be moved for cleaning.
2. Thisunitmustbeinstalledwithadequatebackowprotectiontocomplywithapplicablefederal,
state and local codes.
3.Waterpipeconnectionsandxturesdirectlyconnectedtoaportablewatersupplyshallbesized,
installed and maintained in accordance with federal, state, and local codes.
NOTE:Awaterltrationsystemmustbeusedtohelpmaintaintrouble-freeoperation.Air must be
purged from the cartridge prior to connection to equipment. Inareaswithextremelyhardwa-
ter,wehighlyrecommendtheuseofaCurtisapprovedwaterlter.Forourfulllineoflters,please
log on to www.wilburcurtis.com.
SETUP STEPS
1. The unit should be level (left to right - front to back), on a secure surface.
2. Connect the water line to the water inlet tting on the rear of the unit. Water volume going to the
machine should be consistent. Use tubing sized sufciently to provide a minimum ow rate of
two gallons per minute.
For the latest specications and information go to www.wilburcurtis.com
Produkspesifikasjoner
| Merke: | Wilbur Curtis |
| Kategori: | Ikke kategorisert |
| Modell: | WB5NLB |
Trenger du hjelp?
Hvis du trenger hjelp med Wilbur Curtis WB5NLB still et spørsmål nedenfor, og andre brukere vil svare deg
Ikke kategorisert Wilbur Curtis Manualer
28 September 2025
27 September 2025
27 September 2025
26 September 2025
26 September 2025
26 September 2025
26 September 2025
26 September 2025
25 August 2025
Ikke kategorisert Manualer
- Easypix
- Gamma
- Geneva
- M-Audio
- Korg
- OnePlus
- Zaahn
- Autoscript
- V7
- CMI
- SetonixSynth
- Mac Tools
- Lenovo
- Leitz
- Eikon
Nyeste Ikke kategorisert Manualer
23 Oktober 2025
23 Oktober 2025
23 Oktober 2025
23 Oktober 2025
23 Oktober 2025
23 Oktober 2025
23 Oktober 2025
23 Oktober 2025
23 Oktober 2025
23 Oktober 2025